Geotech
Klipdrift Pipeline N1 Pipe Jack
Two water reservoirs on opposite sides of the N1 near Hammanskraal, north of Gauteng, are to be connected as part of the upgrade and extension of the Klipdrift WTW near Hammanskraal. The two reservoirs will be connected with a 750mm steel pipe, which will be housed in 2.2m high, 2.8m wide box culverts which will have to be pipe jacked beneath the N1.
Read moreHusab Uranium Mine
Husab Uranium Mine is located approximately 80km east of Swakopmund, Namibia, and is situated on the 3rd largest uranium deposit in the world. Based on the initial reserve estimate, Husab’s mine life is estimated to be 16 years. ARQ was approached to assist with the design of the tip wall for the crusher building. This involved a vertical excavation to a depth of some 30m. The initial proposed design comprised lateral support during the excavation via permanent rock anchors and soil nails. This design was conducted using Rocscience’s Phase2 finite element software.
Read moreGibson Bay Wind Farm
ARQ was responsible for the Geotechnical investigation for the road centreline and Wind Turbine generators foundation conditions. The geotechnical investigation included test pits, rotary core drilling, DPSH’s, CSW and Electrical resistivity testing.
Read moreRamming into action
With the ever-increasing demand for coal due to the construction of new Eskom coal fired power stations, Total Coal South Africa have expanded their Dorsfontein operation to mine other seams of coal in the area. This expansion included the construction of a new 30m high coal stockpile which comprises a Reinforced Earth basin to house the stockpile with a tunnel running underneath it. The tunnel is used to transport the coal from the stockpile via a conveyor belt system. Due to the type of equipment being installed in the tunnel, it was imperative that the total and differential settlements were minimised.
Read more

Dams & Hydro
Geotech
Advanced Numerical Analysis