Numerical Modelling For Design Of A Side Spillway Concrete Infill Structure At Yusufeli Dam
SANCOLD 2025 ANNUAL CONFERENCE 5-6 November 2025
By RO Cassells, ARQ Dams Pty Ltd
-co-author, QHW Shaw, GD Roberts, D Aydoğan, FV Ҫevik
Yusufeli Dam is a 275 m high double-curvature concrete arch dam on the Coruh River in the Artvin Province of the Black Sea region of Turkey. The dam has a developed crest length of 540 m and a section thickness of 8 m at the crest and 90 m at the base on the crown cantilever. The dam was constructed with conventionally vibrated mass concrete and the structure contains 4 million cubic meters of concrete, impounding 2.1 billion m3 of water at full supply level.
The dam has a controlled crest spillway, with three gates, which is supplemented by two controlled spillway tunnels on the right flank discharging into the river approximately 1 km downstream of the dam. The dam has a system of four mid-level outlets, which discharge into the spillway plunge pool immediately downstream. The spillway tunnels are controlled by radial gates operating on concrete peers supported by a mass concrete infill structure founded on the foundation in a gulley upstream of the right abutment.
This paper discusses the numerical modelling considerations, techniques and methodology adopted to design the control gates infill structure for sliding stability by implementing a shear key design approach. The complex loading and foundation-structural interaction of the stiff concrete infill structure placed in the gulley of the relatively flexible foundation rock mass, comprised challenging structural behaviour that was simulated using the finite element method.
Return


Dams & Hydro
Geotech
Advanced Numerical Analysis